Design, build and commissioning of Allen Bradley PLC based subsea cable burial plough handling control systems for The Engineering Business Ltd.
Propeller Shaft Power Meter / Torsion Meter
The 17 year old Torsion Meter on Tor Baltica had an obsolete micro computer (responsible for data acquisition, calculation & display) which had failed and was beyond economical repair, rendering the entire system unusable.
Main Bearing Monitoring System Retrofit – Containerships
MJR Controls were awarded a 4 ship turnkey design, manufacture, installation and commissioning contract to retrofit Main Engine Bearing Monitoring & Protection Equipment for Andrew Weir Shipping’s “River” class fleet.
Soren T Lyngso UMS 213 Overhaul – RoPax Ferry
When P&O European Ferries (Irish Sea) Ltd took re-delivery of their RoPax vessel ‘Bison’ after long term charter to another operator, a major equipment refurbishment programme was required.
Diesel Electric Thruster Switchboard, Control & Soft Starter
During the conversion of the P&O European Ferries (Irish Sea) Ltd RoPax vessel ‘European Leader’ at A&P Falmouth an additional Diesel Electric Tunnel Thruster was installed, powered from a standalone Diesel Genset.