Following on from our previous generator replacement project we were asked by the vessel managers Bernard Schulte Ship Management to investigate the feasibility of replacing the valve control system.
LPG Carrier ‘Happy Lady’ – Installation of Replacement Generators
Due to continual reliability problems, age and availability of spares, the owner decided to replace all three of the vessels main diesel generators.
Main Engine Safety System Upgrade – RoPax Ferry
After failure of a Main Engine crankshaft, MJR were contracted to design and replace the safety systems on P&O European Ferries ‘European Seafarer’.
Power Factor Correction System – LPG Carrier
Reducing unnecessary machinery running hours can make dramatic savings on running costs.
Emergency Switchboard – Heavy Lift Vessel
Operating in the marine and offshore industry we’re used to working to impossibly tight deadlines.
Major Automation & Electrical Upgrade – Car Carrier
In 2001, United European Car Carriers (UECC) contracted MJR to deliver a major automation and electrical system upgrade to ‘M/V Autocarrier’ at Germany’s Lloyd Werft Yard in Bremerhaven.
Life Extension Project – Car Carrier
Over a seven week docking period in Santander, Spain we replaced virtually every automatic control and monitoring system on United European Car Carriers (UECC) vessel “MV Autotansporter”.
Pipe Carousel Barge Construction – Technip Snohvit Project
In order to provide a portable pipe spooling facility for the Snohvit project in the north of Norway, Technip commissioned the construction of a pipe spooling barge complete with twin rigid pipe carousel systems.
Waste Recycling Plant Electrical Power & Automation System
The latest Government and EU guidelines on waste management have led to a number of companies investing heavily in the design and development of integrated waste recycling plants.
Bearing Monitor Design – RoPax Ferry
The existing 24 year old main bearing monitoring systems on three sister ships had become increasingly unreliable and inaccurate, contributing to machinery failure.
Machinery Monitoring Upgrade – Cruiseship
In September 2001, MJR Controls were awarded a contract by Airtours Suncruises to replace the existing ASEA Stromberg Selma obsolete machinery monitoring and alarm system on their flagship cruiseship “MV Sunbird”.
Design of Telegraph Order Printer & Recorder
P&O’s European Diplomat was fitted with an obsolete NUNOTANI KEIKI SEISAKUSHO CO. LTD PITCH LOGGER (MODEL NO:DP-3E) which had failed and was beyond economical repair.